The information in this page are only a partial and summary statement of the real project.
The purpose of this text is only to provide a rough track.


Reference project:  C 1456 date 3-9-2001

Plant of 1.400.000 m3/h divided in 7 air conditioning units, for a synthetic textile manufacturing plant in IRAN.

 

PURPOSE OF THE PLANT

Brief description of the components

The process air after having stabilized yarns (Quenching) and conditioned (Take-up), it is partly taken from the axial through vents positioned in an intake manifold at the top of the room and partly expelled from the Torrini expulsion sites on the roof of the department (this amount of air expelled is always replenished with outside air).
The air in the subject which for convenience we will call-back, is piped to a trio of roller shutters and there will be either expelled and reinstated with outdoor air or recirculated.
The trio of dampers receives commands from a microprocessor that analyzes the characteristics of the air detected by a temperature probe placed in front of the washer.
At this point the air undergoes a first filtration means of rotating filters and is then conveyed in the washer where it is a treatment of adiabatic humidification.
From here on is divided into two parts, since it must go to the service of two distinct areas precisely Quenching and Take-up.

Quenching air service.

After being wetted by the washer is so treated:

1) cooled and dehumidified by cooling coil,
2) and conveyed through inlet centrifugal fans,
3) heated by heating batteries,
4) Filtered finely filters high degree of filtration,
5) Adjust pressure through the shutters of surplus.

1) The cooling coil control valves are controlled via three-way pneumatic receiving impulses from the microprocessors that analyze the characteristics of the air detected by the probes of moisture placed after the treatments 1 / 2 / 3 / 4.

2) The centrifugal fans are likely to provide the air needed to operate the same prevalence of the spinning process.

3) The battery heater control valves are controlled via two-way pneumatic receiving impulses from the microprocessors that analyze the characteristics of the air detected by temperature sensors placed after the treatments 1 / 2 / 3 / 4.

4) The filters have a pressure gauge that allows the U-valued when they replace.

5) The surplus dampers are controlled by pneumatic pistons which receive impulses from the microprocessors that analyze the air pressure detected by pressure from probes placed after the treatments 1 / 2 / 3 / 4.

At this point the air is piped to the process machines NEUMAG.

Air service to Take-up.

After being wetted by the washer is so treated:

1) cooled and dehumidified by cooling coil,
2) heated by heating batteries,
3) and conveyed through axial inlet.

1) The cooling coil control valves are controlled via three-way pneumatic receiving impulses from the microprocessors that analyze the characteristics of the air detected by the probes of moisture placed after the treatments 1 / 2.

2) The batteries of heating are controlled by pneumatic control valves, two-way receiving the pulse from the microprocessor that analyzes the characteristics of the air temperature detected by the probes placed after the treatments 1 / 2.

3) The axial fans are likely to provide the required air distribution mainly in the Take-up.

 

SUPPLY LIST

N ° 40 multiple shutter blades made of extruded aluminum rotating on bearings, with a galvanized steel frame to contain leverage and control for external profiles suitable tightness are present on the blades and chassis.

No. 12 dampers expulsion
No. 12 recirculation dampers
No. 16 outside air intake dampers
Manufacturer: Martel

No. 60 wire covers made of sheet steel AISI 304 with a specific profile.
Manufacturer: aerothermal Italian

N ° 40 servo pneumatic piston complete with plates, and levismi pilot positioner
Manufacturer: Johnson Control

N ° 4 centrifugal blower d.Ä. high efficiency, with painted steel impeller and blades aerodynamic profile, complete with pedestal, electric motor, transmission of motion.
Manufacturer: F.lli. Ferrari

No. 12 Axial in direct coupling, the cashier combs are made of sturdy sheet steel with a large suction nozzle and flange according to DIN 24154th. The impeller consists of conical bush locking cast iron shell molded steel blades airfoil aluminum alloy adjustable spark stationary and dynamically balanced according to grade 4. The fans are hot-dip galvanized as standard
Manufacturer: F.lli. Ferrari

N ° 10 Battery for air heating performed with galvanized steel frame, aluminum fins, tubes, steel and iron manifold.
Manufacturer: Dbm.

No. 10 valve body with two-way pneumatic servomotor equipped with membrane drive rubber, soft kind of contrast and easily reversible, returning to the resting position with no signal.

Manufacturer: Spirax Sarco

 

N ° 20 for cooling the battery made with galvanized steel frame, aluminum fins, copper tubes and collector in iron.
Manufacturer: Dbm.

No. 20 valve body with three-way, equipped with pneumatic servo drive rubber membrane and soft contrast to the return to resting position with no signal.
Manufacturer: Spirax Sarco
N ° 12 filter with fully automatic self-cleaning built-bent galvanized steel. The assembly of all components is made by bolts or rivets steel.
Manufacturer: Filtrotecnica

N ° 60 port inspection carried out in air-tight cake tin lined with plastic and polyurethane foam inside with average density of 55 kg / mc
Manufacturer: Martel

N ° 4 Electric panel protection and control of electric utilities having the following characteristics:

- Type interior
- Reference standards IEC EN 60439-1 IEC 439-1 CEI 17/13-1
- Steelwork color RAL 7032, protection class IP 55
- Switch maneuver-equipped locker
- Rated insulation voltage: 500 V
- Degree of protection inside the panel: IP2X


- Electrical system: Class I type TT or TN
- Protection of individual users with valves, fuses or circuit breakers, motor protectors or
- Command contactor with coil
- Alerts with spies
- Identification plates
- Sheet metal fabrication brand Costel
- Circuit breakers and / or differential, holders, push button, signal lamps, clamps, power contactors, auxiliary contactors, motor protectors, safety equipment brands: Siemens
- Surge protectors brand DEHN - vault
- Network analyzer, timers, soft starters ADX brand lovato
- UPS UPS brand silectron
- Measuring Instruments brand FRER
N ° 4-tire electric panel for the control and command of equipment adjustment, with:

- Framework of containment equipment with protection IP 55
- Multiadjustment configurable microprocessor modules and eight control, two analog outputs, six digital outputs brand eurotherm
- Switch power function locker
- Type transducers TY 4-20 mA, 4-20 mA PDY brand eurotherm
- Pressure gauge 0-30 psi control pressure brand eurotherm
- Group reduction - Compressed air filtration
- Temperature probes TT 4-20 mA brand eurotherm
- MT moisture probes 4-20 mA brand eurotherm
- 4-20 mA probes pressure PDT brand eurotherm

No. 4-type air washer prefabricated totally made of stainless steel AISI 304 and antioxidant materials including:

- Double containment and equipment made of AISI 304
- Inspection steel hollow door, handle with seal
- Stainless steel manifold for water suction
- Collectors steel for power ramp
- Accessories for the overflow discharge ball valve with quick
- Pump engine
- Outdoor pool entirely of stainless steel AISI 304 complete with double static filters suitable for cleaning without detention facility.
- Ramps nozzle material PVC antioxidant
- Groups of tangential nozzles with quick release compounds from a nozzle printed polypropylene clamps with stainless steel AISI 430 AISI 304 stainless steel screw clamps and spring in stainless steel AISI 316 hardened
Manufacturer: Martel

N ° 24 Afonizzazione for noise reduction 's electric-back, performed with elements phono-absorbent resonators rock wool, covered in aluminum.
Manufacturer: Martel

N ° 400 cells filter absolute filtration grade 95% ASHRAE
Manufacturer: Camfil

September smooth black SS Pipe, valves, fittings, flanges, gaskets etc.. for connecting the batteries warm, cold and air washers.

September electrical equipment and the various electrical connections within the central air conditioning including:

- Conductor type FG7 isolation 0.6 - 1 kV Brand: Pirelli
- Galvanized pipes with lid brand gammaP
- Materials accessories: Pliers, collars, plugs, etc..
- In addition to the above in your electrical diagrams will provide the materials necessary for the realization of the lighting (normal and emergency) and sockets CEE

 

 

 

Material specification 1

ZA-L-271-01
ZA-L-272-01
271-A-01
272-A-01
11
Air conditioning Unit
360000-135000 mc / h
CP-L-271-01
CP-L-272-01
271-E-01
272-E-01
11
Electrical Control Panel
ZM-L-271-01
ZM-L-272-01
271-M-01
272-M-01
11
Regain air duct set with
dampers, gaskets, etc..
ZM-L-271-02
ZM-L-272-02
271-M-02
272-M-02
11
Air Duct set from trench to
quenchings
ZA-L-274-01 274-A-01 1
Textile laboratory air
conditioning unit
18.000mc / h
CP-L-274-01 274-E-01 1 Electrical Control Panel
LL-274-01 274-L-01 1 Electrical and pneumatic
instruments September
ZM-L-274-01 274-M-01 1 Air distribution duct set with
dampers, gaskets, etc..
ZA-L-275-01 275-A-01 1

Control room air
conditioning unit
35.000mc / h
CP-L-275-01 275-E-01 1 Electrical Control Panel

LL-275-01 275-L-01 1 Electrical and pneumatic
instruments September
ZM-L-275-01 275-M-01 1 Air distribution duct set with
dampers, gaskets, etc..
ZA-M-276-01 276-A-01 1
Spinning staple air
conditioning, unit

80.000mc / h
CP-M-276-01 276-E-01 1 Electrical Control Panel
ZM-M-276-01 276-M-01 1 Air Duct Regain set with
dampers, gaskets, etc..
LM-276-01 276-M-02 1 Air Supply September
ZA-M-277-01 277-A-01 1 Air conditioning unit
160,000 mc / h
CP-M-277-01 277-E-01 1 Electrical Control Panel
ZM-M-277-01 277-M-01 1 Air Duct Regain set with
dampers, gaskets, etc..
LM-277-01 277-M-02 1 Air Supply September
ZA-M-278-01 278-A-01 1
Draw air staple fibers
conditioning unit
160.000mc / h

 

Material specification 2

FAN SHOOTING ITEM REQUIRED 271-A-01.2/A/B/C/DN ° 4
Return air fans No. required

BAND FILTERS DUST COLLECTORS ITEM REQUIRED 271-A-01.3/A/B/C/D/E/FN ° 6
Belt No. dedusting air filters required

ROOM TO RAIN REQUIRED ITEM 271-A-01.4/A/BN ° 2
Air washer No. required

PUMP WATER RECYCLING ITEM REQUIRED 271-A-01.5/A/B/C/D/S/SN ° 6
Water Circulation Pumps No. required
6
x

Cooling coil QUENCHING ITEM REQUIRED 271-A-01.6/A/B/C/D/E/F/G/HN ° 8
No. required for quenching air coolers
7
x

Cooling coil BOBINATOI ITEM REQUIRED 271-A-01.7/A/BN ° 2
Coolers for take-up air required No.
8
x

FAN DISCHARGE QUENCHING 271-A-01.8/A/B/C/DN ITEM 4 ° Request
Quenching main air fan No. required
9
x

HEATER AIR QUENCHING 271-A-01.9/A/B/C/D/E/F/G/HN ITEM REQUIRED ° 8
Heater for air quenching No. required
10
x

Heating Air BOBINATOI ITEM REQUIRED 271-A-01.10/A/BN ° 2
Heaters for take-up air required No.
11
x

FAN AIR FLOW BOBINATOI ITEM REQUIRED 271-A-01.12/A/BN ° 2
Take-up air fan Main No. required
12
x

GUARD AIR FILTER FOR QUENCHING 271-A-01.11/A/B/C/DN ITEM 4 ° Request
Quenching air cooler filters No. required
13
x

FAN purge air ITEM REQUIRED 271-A-01.13/A/BN ° 2
Pump air fan No. required
14

FIRE OVER AIR EXTERNAL ITEM No. REQUIRED
Air make-up stack No. required
15
x

ELECTRIC MOTORS / MOTORS
Electrical motors / gear motors
16
x

FAN SHOOTING ITEM REQUIRED 271-A-01.2/A/B/C/DN ° 4
Return air fans No. required
17

BAND FILTERS DUST COLLECTORS ITEM REQUIRED 271-A-01.3/A/B/C/D/E/FN ° 6
Automatic Rotary Filter No. required
18
x

Recirculation pump ITEM REQUIRED 271-A-01.5/A/B/C/D/E/FN ° 6
Water Circulation Pumps No. required
19
x
FAN DISCHARGE QUENCHING 271-A-01.8/A/B/C/DN ITEM 4 ° Request
Quenching main air fan No. required
20
x
FAN AIR FLOW BOBINATOI ITEM REQUIRED 271-A-01.12/A/BN ° 2
Take-up air fan Main No. required
21
x
FAN purge air ITEM REQUIRED 271-A-01.13/A/BN ° 2
MPurge air fan No. required
22
x

PAINTINGS ELETTROSTRUMENTALI
Electrical panels Instruments
23

CONSOLE ON THE MACHINE ITEM No. REQUIRED
Local control panel No. required
24.          
x
POWER REQUIRED UNDER ITEM No. 1
Power Panel No. required
25

UNDER REMOTE CONTROL ITEM No. REQUIRED
Remote control panel No. required
26
x

SYSTEM CONTROL AIR QUENCHING
x

AUTOMATIC

SEMI-AUTOMATIC

MANUAL
Control system for air quenching Automatic Semi-Automatic Manual
27
x

AIR CONTROL SYSTEM BOBINATOI
x

AUTOMATIC

SEMI-AUTOMATIC

MANUAL
Control system for take-up air Automatic Semi-Automatic Manual
28
x
INSTRUMENTATION FOR MARK, ADJUSTMENT AND PROTECTION
Indicating, control and protection instruments
29
x

PIPELINE INTERCONNECTION TO THE EXTENT OF THE PACKAGE:
Interconnecting piping as per package limits for:
30
x

WATER COOLING

CHILLED WATER

PROCESS
x

INSTRUMENTATION
x

STEAM
Chilled Water Cooling Water Main Steam Process Instruments
31 THE COMPLETE WITH VALVES, FITTINGS, FLANGES AND GASKETS YES
Full of valves, unions, flanges and gaskets
32 LIMIT FOR PIPE DIAMETER threaded 2 "
Limits for pipe or threaded connections
33 LIMITS FOR PIPE DIAMETER PRECAST NO 1 "
ø limits for non-prefabricated pipings
34

Initial load of lubricating oil for REDUCER
Initial cooling medium / oil charge Kg
35

SPECIAL KEYS AND TOOLS FOR DISASSEMBLY AND MAINTENANCE No. REQUIRED
Special disassembly and maintenance tools and wrenches No. req.
36
x

SPARE PARTS FOR: YEARS OF EXERCISE No. 2 APPLIED September 1
Spare parts for: Years running No. req.
37
x

DOCUMENTATION: instruction manual, Drawing # 7 COPIES REQUIRED
Documentation: Instruction manual, drawings No. req.
38
x

INSULATION
x

PAINTING
Insulation Painting

 

 

 

 