The information in this page are only a partial and summary statement of the real project.
The purpose of this text is only to provide a rough track.


Reference project:  C C 1381 date 06-06-2001

Suction system with robotic self-levelling suction nozzle and filter by water for dust capturing.

Colours mixing department

 

DESCRIPTION OF THE PLANT

Necessary Energy:
Electricity
380 V three-phase with ground
50 Hz
Starter motors
Direct start up to 11 KW
Star and triangle from 15 KW

SUCTION PLANT

Plant description wet filter
Number of treatment units No. 1
Amount of air treated m³ / h 4,000
Consumption H2O m³ / h 0.63
Electric power installed KW 4
Electrical power consumption 3.2 KW axis

SUPPLY LIST

Plant Shooting
Bottom To
RETURN AIR
Hose No. September
Structure to balance manual precision
steel AISI 304 No. 1
Structure for automatic scales
steel AISI 304 No. 1
Water filter complete with stainless steel structure
AISI 304 No. 1
Guillotine dampers manual N ° 2
Ventilation
Centrifugal blower shooting galvanized No. 1
Sewer EXP
Network + EXP strip stainless steel AISI 304 No. 1
Conducted expulsion in stainless steel AISI No. 304 September
Control system
Electrical panel N ° 1

 

 

 

 

 